Maseru Water Supply Phase III, Pre-feasibility study, Volume 2, Main Report (Draft). October 1992.
Lahmeyer International . 1992. Maseru Water Supply Phase III, Pre-feasibility study, Volume 2, Main Report (Draft). October 1992.. Water and Sewerage Authority, Lesotho..
Link to document | No download available. |
---|---|
Country | Lesotho |
Keywords | Water Supply, |
Item type | Publication - Report |